top of page

All Stuart Wright's suggestions on Norsok D010 Rev3 have been accepted by Editors in the latest

Revision 4 of Norsok D-010 Standard, Well Integrity in Drilling and Well Operations was released in December 2012 for enquiry and the goal to release the revised standard is in June 2013.

The proposed revision included over 450 changes, proposed by WI stakeholders throughout the industry, intended to improve the standard. New suggestions by Stuart Wright, submitted on 14 Nov 2011 to PSA’s Principal Engineer for Drilling and well technology, have all been taken into consideration by the Editors for inclusion in this latest revision.

Download a summary of Stuart Wright's comments here.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page